CHOCZEWO – GDAŃSK PRZYJAŹŃ ELECTRICITY TRANSMISSION LINE

Construction of the 400 kV Choczewo – Gdańsk Przyjaźń electricity transmission line in northern Poland. The complete line will have a total length of 90 km, crossing 10 municipalities in the Pomerania region and connecting the Choczewo substation with the Gdańsk Przyjaźń substation. Specifically, this new transmission line will facilitate the integration of electricity generated […]

NAMYSŁÓW–OLEŚNICA ELECTRICITY TRANSMISSION LINE

The project signed with Polskie Sieci Elektroenergetyczne (PSE) involves the construction of a 40-km electricity transmission line running from Namysłów County, in the Opole Voivodeship, through the municipalities of Wilków and Namysłów, to Oleśnica County, in the Lower Silesian Voivodeship. The project will be carried out in southern Poland, while the other three projects signed […]

CONNECTION OF THE CHOCZEWO SUBSTATION TO THE SŁUPSK–ŻARNOWIEC TRANSMISSION LINE

The project consists of connecting the Choczewo substation to the existing Słupsk–Żarnowiec transmission line, with the aim of strengthening Poland’s power grid and facilitating the integration of electricity generated by offshore wind farms in the Baltic Sea. Aldesa is constructing this 400 kV transmission line for Poland’s transmission system operator, Polskie Sieci Elektroenergetyczne (PSE).

CHOCZEWO – GDAŃSK BŁONIA – GRUDZIĄDZ WĘGROWO POWER TRANSMISSION LINE

The project aims to strengthen Poland’s power grid and facilitate the integration of electricity generated by offshore wind farms in the Baltic Sea through the construction of a 400 kV transmission line along the Choczewo – Gdańsk Błonia – Grudziądz Węgrowo route. With this project, Poland’s transmission system operator, Polskie Sieci Elektroenergetyczne (PSE), once again […]

TRANSMISSION LINES IN GUERRERO – SANTA ROSALÍA

Construction and installation of two 115 kV transmission lines with a total length of 136.3 circuit-kilometres, as well as two 115 kV substations with 5 MVAr of reactive power compensation and four high-voltage feeders. The project is located in the State of Baja California Sur, Mexico.

CONSTRUCTION OF MACHINE ROOMS, EQUIPMENT AND ELECTROMECHANICAL INSTALLATIONS FOR THE DURANGO–MAZATLÁN HIGHWAY TUNNELS

Comprehensive construction of machine rooms, utility connections, ventilation, lighting, safety, communications, and centralised control systems for the tunnels along the Durango–Mazatlán Highway, including civil works, electromechanical installations, and associated works. The scope included the manufacture and installation of forced ventilation systems, interior and exterior lighting, electronic safety systems, communications and traffic control systems, as well […]

LOS DIABLOS SPORTS FACILITY

Comprehensive construction of a professional baseball stadium for the Diablos Rojos del México team. The project included the construction of covered stands, VIP areas, service facilities, changing rooms, offices, access areas, technical facilities, and external urban development works. The stadium was designed to meet international standards and provide a modern, high-quality sporting experience. The project […]

CHALHUAMAYO II HYDROELECTRIC POWER PLANT

Comprehensive execution of the second stage of the expansion of the Chalhuamayo II Hydroelectric Power Plant, including civil works and the supply and installation of specialized electromechanical equipment.The scope included the modernization of the overspeed protection system for the penstock, as well as adaptations to adverse climatic conditions. Developed for ELECTROCENTRO S.A., the project involved […]