FUEL OIL STORAGE TANK – KOLUSZKI

Construction of a fuel oil storage tank in Koluszki with a capacity of 33,000 cubic metres, together with the associated infrastructure. The project will increase the facility’s total storage capacity from 439,000 to 472,000 cubic metres. This expansion will help improve the operational efficiency of the complex and strengthen the fuel logistics network in the […]

PERN 4 STORAGE TANKS – DĘBOGÓRZE

Construction of two Class III petroleum product storage tanks, each with a capacity of 32,000 m³, together with the associated infrastructure at Fuel Depot No. 21 in Dębogórze, Poland. The scope of works included the construction of monolithic reinforced-concrete foundations, installation of steel structures, process piping, electrical, sewerage and water supply systems, as well as […]

MORELOS HIGH-PRESSURE GAS PIPELINE

Construction of the “Morelos” high-pressure gas pipeline, comprising 160 km of 30″ and 24″ steel pipelines, including civil works, mechanical works, special crossings, and valve stations. The project encompasses the complete construction of the gas pipeline in two sections: Cuautla–Atlixco and Atlixco–Tlaxcala, crossing the states of Morelos, Puebla, and Tlaxcala. The scope of work includes […]

Olefin Production Expansion in Płock – K002 Scope

The scope of work includes the delivery of infrastructure for the New Chemistry complex (formerly Olefins III) under Package K-002, including the construction of storage infrastructure comprising 18 spherical tanks with a total capacity of 27,000 m³, 14 vertical tanks with a capacity of 50,000 m³, 2 horizontal pressure vessels with a capacity of 5,000 […]