CONSTRUCTION AND FIT-OUT OF CORPORATE INTERIORS AND OFFICE FLOORS FOR MAPFRE MEXICO HEADQUARTERS

The project involved the comprehensive execution of interior finishes, building services, and technical furnishings for Mapfre’s new offices on Avenida Revolución in Mexico City, under a fixed-price contract. Works were carried out across all floors of the building, from the basement through Level 9, including lighting, HVAC systems, partitions and glazing, civil works, and ancillary […]
GUADALAJARA WORKSHOPS AND DEPOT

Construction of workshops, train stabling facilities, an administrative building, and ancillary buildings, together with the manufacture and supply of fixed installations and general equipment for each workshop. The scope also included the supply of auxiliary rail vehicles, parking areas, landscaped areas, general site development works, and the commissioning of all facilities. Located at the southern […]
PACHUCA TUNNEL

Construction of a road tunnel at km 16+440 of the Pachuca–Huejutla Highway, on the section between Real del Monte and the Huasca Interchange, in the State of Hidalgo, Mexico. Designed to accommodate four traffic lanes, the infrastructure includes hydraulic concrete pavement, horizontal and vertical road signage, drainage works, ancillary works, and electrical installations. The project […]
CAF STATIONS

Comprehensive construction of five stations as part of the extension of the Suburban Railway on the Lechería–Felipe Ángeles International Airport (AIFA) section, under a fixed-price, fixed-term construction contract. Stations 1, 2 and 4: Complete construction of the stations and technical rooms, including foundations, architectural works, finishes, electrical and mechanical installations, general equipment, and panoramic elevators. […]
TUXTLA GUTIÉRREZ – SAN CRISTÓBAL DE LAS CASAS HIGHWAY WIDENING

Execution of widening works to add a third lane along 29 km of the Tuxtla Gutiérrez–San Cristóbal de las Casas section, including the upgrading and modernization of three runaway truck ramps, the widening of four bridges, and improvements to nine grade-separated crossings. The project also included the construction of the San Cristóbal access interchange, the […]
ROAD CORRIDOR 42

Road improvement, maintenance, and management activities were carried out over a five-year period. The works included earthworks, paving, drainage works, road signage, and traffic safety measures, as well as comprehensive maintenance of the infrastructure to ensure optimal service conditions. The project also included road management activities through vehicle weight control, in compliance with the applicable […]
MAPFRE PERU HEADQUARTERS – PHASE 2

Construction of Mapfre’s new corporate headquarters in Lima, Peru, carried out in two consecutive phases. The first phase included the construction of five basement levels using diaphragm walls and slope stabilization works. The second phase comprised the complete building structure, high-quality finishes, and sustainable building systems. The project was delivered under a lump-sum contract in […]
NH PARDO 200 HOTEL

Construction of the new PARDO 200 Mixed-Use Building, located in the heart of Lima’s commercial district, Peru. The project comprised the comprehensive construction of a mixed-use complex integrating a five-star hotel, office space, and retail areas, with a total built area of 62,531 m² across 18 floors and 600 parking spaces. The scope included the […]
LUBIÁN HIGH-SPEED RAIL LINE

Construction of the railway platform for the Lubián – La Canda Tunnel section of the Madrid–Galicia High-Speed Rail Line. The project involves the construction of the railway platform along a section of significant technical complexity, located on the connection between Zamora and Ourense within the North–Northwest high-speed corridor. The works include earthworks, tunnel excavation and […]
IMPLEMENTATION OF THE SARANDÍ DEL YÍ – LASCANO ROAD CORRIDOR: CONSTRUCTION AND REALIGNMENT OF ROUTES No. 14 AND No. 15

Implementation of a road corridor with a total length of 183.75 km, extending from the city of Sarandí del Yí to Lascano, including 145.14 km along Route No. 14 and 38.61 km along Route No. 15. The scope includes the construction of a new alignment for Route No. 14, incorporating realignments, bypasses, and new junctions […]