HARSTAD

Comprehensive construction of the Harstadåstunnelen tunnel in northern Norway, as part of the “Harstadpakken” programme. The scope included the construction of a high-capacity road tunnel, a temporary access road, the redevelopment of the road above the Seljestad portal, and full preparation for the electrical installations. The project also included all excavation, lining, interior finishing, and […]
CONSTRUCTION AND FIT-OUT OF CORPORATE INTERIORS AND OFFICE FLOORS FOR MAPFRE MEXICO HEADQUARTERS

The project involved the comprehensive execution of interior finishes, building services, and technical furnishings for Mapfre’s new offices on Avenida Revolución in Mexico City, under a fixed-price contract. Works were carried out across all floors of the building, from the basement through Level 9, including lighting, HVAC systems, partitions and glazing, civil works, and ancillary […]
GUADALAJARA WORKSHOPS AND DEPOT

Construction of workshops, train stabling facilities, an administrative building, and ancillary buildings, together with the manufacture and supply of fixed installations and general equipment for each workshop. The scope also included the supply of auxiliary rail vehicles, parking areas, landscaped areas, general site development works, and the commissioning of all facilities. Located at the southern […]
PACHUCA TUNNEL

Construction of a road tunnel at km 16+440 of the Pachuca–Huejutla Highway, on the section between Real del Monte and the Huasca Interchange, in the State of Hidalgo, Mexico. Designed to accommodate four traffic lanes, the infrastructure includes hydraulic concrete pavement, horizontal and vertical road signage, drainage works, ancillary works, and electrical installations. The project […]
CAF STATIONS

Comprehensive construction of five stations as part of the extension of the Suburban Railway on the Lechería–Felipe Ángeles International Airport (AIFA) section, under a fixed-price, fixed-term construction contract. Stations 1, 2 and 4: Complete construction of the stations and technical rooms, including foundations, architectural works, finishes, electrical and mechanical installations, general equipment, and panoramic elevators. […]
TUXTLA GUTIÉRREZ – SAN CRISTÓBAL DE LAS CASAS HIGHWAY WIDENING

Execution of widening works to add a third lane along 29 km of the Tuxtla Gutiérrez–San Cristóbal de las Casas section, including the upgrading and modernization of three runaway truck ramps, the widening of four bridges, and improvements to nine grade-separated crossings. The project also included the construction of the San Cristóbal access interchange, the […]
ROAD CORRIDOR 42

Road improvement, maintenance, and management activities were carried out over a five-year period. The works included earthworks, paving, drainage works, road signage, and traffic safety measures, as well as comprehensive maintenance of the infrastructure to ensure optimal service conditions. The project also included road management activities through vehicle weight control, in compliance with the applicable […]
LOS AHIJONES URBAN DEVELOPMENT – PHASE 1

Urban development works for the UZP 2.03 “Desarrollo del Este – Los Ahijones” area in Madrid. The project involves the comprehensive development of this new urban district in southeast Madrid, transforming the area into fully serviced plots ready for construction. The works include earthworks, water supply and sewerage networks, drainage collectors, gas, electricity and telecommunications […]
UTE RENFE FUENCARRAL

Construction of the new Fuencarral II High-Speed Rail maintenance workshop and self-propelled train track yard at the Madrid Norte railway complex.
PORT OF HUELVA

Implementation of the construction project for water collection at the Ingeniero Juan Gonzalo and Ciudad de Palos quays in the Port of Huelva. The project involves the installation of a comprehensive water collection and conveyance system at two of the main quays within the Port of Huelva service area, with the aim of improving water […]