NATIONAL MUSEUM OF ARCHAEOLOGY (MUNA)

Construction of the National Museum of Archaeology (MUNA). Comprehensive execution of the works for the new National Museum of Archaeology, including foundation works, structural works, building envelope, and high-standard finishes, as well as the installation of specialized technical systems for the conservation, exhibition, and management of archaeological collections. The project includes permanent and temporary exhibition […]
MADRID METRO LINE 1 ATOCHA–VALDECARROS JOINT VENTURE

Comprehensive renewal of the track infrastructure and superstructure on Madrid Metro Line 1, Atocha–Valdecarros section. The works include the complete replacement of rails, sleepers and track equipment, the modernisation of electrification systems through the installation of rigid overhead catenary, and the upgrading of ventilation and pumping shafts. he project also includes civil works at stations, […]
UTE RENFE FUENCARRAL

Construction of the new Fuencarral II High-Speed Rail maintenance workshop and self-propelled train track yard at the Madrid Norte railway complex.
PORT OF HUELVA

Implementation of the construction project for water collection at the Ingeniero Juan Gonzalo and Ciudad de Palos quays in the Port of Huelva. The project involves the installation of a comprehensive water collection and conveyance system at two of the main quays within the Port of Huelva service area, with the aim of improving water […]
ZAMORA HIGH-SPEED RAIL LINE (CERNADILLA)

Construction of the platform for the Madrid–Galicia High-Speed Rail Line, Zamora–Lubián section, Cernadilla–Pedralba de la Pradería subsection. The project involves the construction of the high-speed railway platform along a technically complex route through rugged terrain. The works include earthworks, the construction of viaducts and overpasses, tunnels and drainage structures, as well as retaining structures and […]
HEAD TUNNEL OF THE HUESNA WATER SUPPLY SYSTEM

Construction of a 9.6-kilometre-long tunnel and the necessary pipelines to convey water by gravity from the Huesna Reservoir to the Las Chimeneas Drinking Water Treatment Plant (DWTP). This new infrastructure replaces the previous pumping system, enabling estimated energy savings of up to 10 GWh per year and reducing CO₂ emissions by 89%. The project significantly […]
CONSTRUCTION PROJECT FOR TRACK DOUBLING AND ELECTRIFICATION BETWEEN HOSPITAL VILA HALT AND BENIDORM STATION

Construction of the track doubling and electrification works on the section between Hospital Vila halt and Benidorm station.
TERUEL HANGAR JOINT VENTURE

Comprehensive construction of a new airport complex comprising a large-capacity hangar and a production facility, located at Teruel Airport. The contract, awarded by the Teruel Airport Consortium, has a 20-month construction period and a budget of €39.77 million (excluding VAT). The scope includes all civil works, technical installations and equipment required to ensure the full […]
ALICANTE HIGH-SPEED RAIL LINE

Complementary works for the new Levante high-speed rail access on the Madrid–Castilla-La Mancha–Valencian Community–Region of Murcia corridor. Section: Accesses to Alicante. Phase II, Northern Section. The project includes works aimed at optimizing the functionality and safety of the approaches to Alicante station within the Levante high-speed rail corridor. The works comprise the removal of a […]
A-54 NADELA VILAMOURE JOINT VENTURE

Construction of the BU-30 Burgos ring road, Villalbilla de Burgos–Quintanadueñas section. The project involves the construction of a new section of ring road designed to improve mobility and reduce congestion in the city of Burgos. The works include earthworks, pavement construction, interchanges and overpasses, as well as drainage works and structures. The project also incorporates […]