NAMYSŁÓW–OLEŚNICA ELECTRICITY TRANSMISSION LINE

The project signed with Polskie Sieci Elektroenergetyczne (PSE) involves the construction of a 40-km electricity transmission line running from Namysłów County, in the Opole Voivodeship, through the municipalities of Wilków and Namysłów, to Oleśnica County, in the Lower Silesian Voivodeship. The project will be carried out in southern Poland, while the other three projects signed […]

CONNECTION OF THE CHOCZEWO SUBSTATION TO THE SŁUPSK–ŻARNOWIEC TRANSMISSION LINE

The project consists of connecting the Choczewo substation to the existing Słupsk–Żarnowiec transmission line, with the aim of strengthening Poland’s power grid and facilitating the integration of electricity generated by offshore wind farms in the Baltic Sea. Aldesa is constructing this 400 kV transmission line for Poland’s transmission system operator, Polskie Sieci Elektroenergetyczne (PSE).

CHOCZEWO – GDAŃSK BŁONIA – GRUDZIĄDZ WĘGROWO POWER TRANSMISSION LINE

The project aims to strengthen Poland’s power grid and facilitate the integration of electricity generated by offshore wind farms in the Baltic Sea through the construction of a 400 kV transmission line along the Choczewo – Gdańsk Błonia – Grudziądz Węgrowo route. With this project, Poland’s transmission system operator, Polskie Sieci Elektroenergetyczne (PSE), once again […]

SOL DE LILA PHOTOVOLTAIC PLANT

Ejecución de una planta de energía solar fotovoltaica en Santiago de Chile, con una capacidad instalada significativa destinada a la generación de energía limpia. El alcance de los trabajos incluyó la construcción completa de la infraestructura de generación, montaje de paneles fotovoltaicos, obras civiles asociadas, sistemas eléctricos y de control, así como la implementación de […]

GEOMEX SAN JACINTO WIND FARM

Construction of the San Jacinto Wind Farm, with an installed capacity of 20 MW. The contract included all engineering, procurement and construction activities, as well as testing and commissioning of the facility. The scope comprised the installation of wind turbines, foundations, electrical interconnection systems, associated civil works, and the delivery of operation manuals and as-built […]

BUDZYN WIND FARM

Design, supply, construction, and grid connection of the EP44 wind farm, together with the associated infrastructure, including roads, platforms, foundations, internal networks, a 110/30 kV substation, and related works. The scope included civil, mechanical, and electrical works, testing and commissioning, as well as permit management and coordination with the relevant authorities.

AKUO EP44 WIND FARM

Comprehensive delivery of the EP44 wind farm project in Lębork, in the Pomerania region, for the French client Akuo Energy, including the preparation of detailed technical documentation and execution under a BOP contract.The wind farm has a total installed capacity of 44 MW and comprises 12 Vestas V110 wind turbines with a capacity of 2 […]

RIO MAIOR PHOTOVOLTAIC POWER PLANT

Design, construction, commissioning, and maintenance of the Rio Maior and Torre Bela solar photovoltaic power plants, with a total installed capacity of 272 MW. The project scope includes the installation of approximately 500,000 photovoltaic modules, 1,315 inverters, 2,251 km of solar cables, 212 km of medium-voltage cables, 785 km of low-voltage cables, and 68 km […]

GUAJIRO SOLAR PV PLANT

Design, engineering, procurement, construction, testing, and commissioning of the “Guajiro” solar photovoltaic plant, with an installed capacity of 101.40 MW. The scope includes the complete execution of all works required for the project, from site preparation through the installation of electrical and interconnection infrastructure, as well as the construction of operation and maintenance buildings, control […]

TULI-HELIOS SOLAR PV PLANT

Construction of the El Tuli solar photovoltaic plant, with an installed capacity of 187.5 MWp, located in Mazapil, Zacatecas, Mexico. The scope included the engineering, procurement, and construction of the facility, encompassing the AC collection system, 115/34.5 kV step-up substation, transmission line, interconnection switchyard, SCADA and communications systems, access roads, and civil works. The project […]