KM 6+940 TUNNEL – PALENQUE–OCOSINGO SECTION

The project consists of the construction of a 200-metre-long tunnel on the Palenque–Ocosingo section of the Palenque–San Cristóbal de las Casas highway, in the state of Chiapas, Mexico. The project will be carried out by Grupo Aldesa in Mexico together with Constructora de Caminos Chiapas and Consorcio de Ingenieros Constructores y Consultores. The works will […]

KM 6+500 TUNNEL – PALENQUE–OCOSINGO SECTION

The project consists of the construction of a 320-metre-long tunnel on the Palenque–Ocosingo section of the Palenque–San Cristóbal de las Casas highway, in the state of Chiapas, Mexico. The project will be carried out by Proacon México and will include the construction of tunnel portals, earthworks, drainage works, paving, and electrical and lighting installations, among […]

DESIGN AND CONSTRUCTION OF AUXILIARY BUILDINGS FOR THE QUERÉTARO–IRAPUATO RAIL CORRIDOR

Proyecto consistente en el diseño y construcción de cuatro edificios auxiliares del corredor ferroviario Querétaro–Irapuato, impulsado por el Gobierno de México para reforzar y modernizar la red ferroviaria de transporte de pasajeros del país. The contract was awarded by the Agency for Trains and Integrated Public Transport (ATTRAPI), an organization created by the Government of […]

PLANET HOLLYWOOD HOTEL PHASE I and II

Design, construction and turnkey delivery of the Planet Hollywood Cancun resort, developed in two consecutive phases in the area of Costa Mujeres, Quintana Roo. The scope of the works includes the integral execution of the main building, common areas, service areas, technical facilities, swimming pools, spa, restaurants, recreational areas and the exterior urbanization, all complying […]

PROYECTO DE MEDICIÓN INTELIGENTE Y REDUCCIÓN DE PÉRDIDAS CFE – MÉXICO

Diseño, construcción e instalación de un conjunto de siete obras para la Comisión Federal de Electricidad (CFE) en distintas regiones del Estado de México. El proyecto comprendió seis obras de Reducción de Pérdidas en redes eléctricas de 23 kV, con una capacidad total de transformación de 116,616 MVA y la construcción de 462,71 km-C de […]

TUXTLA GUTIÉRREZ – SAN CRISTÓBAL DE LAS CASAS HIGHWAY WIDENING

Execution of widening works to add a third lane along 29 km of the Tuxtla Gutiérrez–San Cristóbal de las Casas section, including the upgrading and modernization of three runaway truck ramps, the widening of four bridges, and improvements to nine grade-separated crossings. The project also included the construction of the San Cristóbal access interchange, the […]

CAF STATIONS

Comprehensive construction of five stations as part of the extension of the Suburban Railway on the Lechería–Felipe Ángeles International Airport (AIFA) section, under a fixed-price, fixed-term construction contract. Stations 1, 2 and 4: Complete construction of the stations and technical rooms, including foundations, architectural works, finishes, electrical and mechanical installations, general equipment, and panoramic elevators. […]

PACHUCA TUNNEL

Construction of a road tunnel at km 16+440 of the Pachuca–Huejutla Highway, on the section between Real del Monte and the Huasca Interchange, in the State of Hidalgo, Mexico. Designed to accommodate four traffic lanes, the infrastructure includes hydraulic concrete pavement, horizontal and vertical road signage, drainage works, ancillary works, and electrical installations. The project […]

GUADALAJARA WORKSHOPS AND DEPOT

Construction of workshops, train stabling facilities, an administrative building, and ancillary buildings, together with the manufacture and supply of fixed installations and general equipment for each workshop. The scope also included the supply of auxiliary rail vehicles, parking areas, landscaped areas, general site development works, and the commissioning of all facilities. Located at the southern […]

TULI-HELIOS SOLAR PV PLANT

Construction of the El Tuli solar photovoltaic plant, with an installed capacity of 187.5 MWp, located in Mazapil, Zacatecas, Mexico. The scope included the engineering, procurement, and construction of the facility, encompassing the AC collection system, 115/34.5 kV step-up substation, transmission line, interconnection switchyard, SCADA and communications systems, access roads, and civil works. The project […]