Railway Line No. 38 Ełk – Korsze

The project involves the implementation of the first stage of the modernisation of Railway Line No. 38 on the Ełk – Korsze section, including its complete electrification. The scope of works includes the comprehensive renewal of the track structure and substructure, installation of electrical systems, and adaptation of the existing infrastructure to increase the capacity, […]

S7 EXPRESSWAY PŁOŃSK – CZOSNÓW

Construction of the S7 expressway between Płońsk and Czosnów, on the section from the Siedlin interchange (excluding the interchange) to the Załuski interchange (excluding the interchange). The route is 12.9 km long. The EU-funded project is being implemented to create a safe road section that will improve Poland’s transport accessibility and interregional connections within the […]

BUDZYN WIND FARM

Design, supply, construction, and grid connection of the EP44 wind farm, together with the associated infrastructure, including roads, platforms, foundations, internal networks, a 110/30 kV substation, and related works. The scope included civil, mechanical, and electrical works, testing and commissioning, as well as permit management and coordination with the relevant authorities.

AKUO EP44 WIND FARM

Comprehensive delivery of the EP44 wind farm project in Lębork, in the Pomerania region, for the French client Akuo Energy, including the preparation of detailed technical documentation and execution under a BOP contract.The wind farm has a total installed capacity of 44 MW and comprises 12 Vestas V110 wind turbines with a capacity of 2 […]

PERN 4 STORAGE TANKS – DĘBOGÓRZE

Construction of two Class III petroleum product storage tanks, each with a capacity of 32,000 m³, together with the associated infrastructure at Fuel Depot No. 21 in Dębogórze, Poland. The scope of works included the construction of monolithic reinforced-concrete foundations, installation of steel structures, process piping, electrical, sewerage and water supply systems, as well as […]

Olefin Production Expansion in Płock – K002 Scope

The scope of work includes the delivery of infrastructure for the New Chemistry complex (formerly Olefins III) under Package K-002, including the construction of storage infrastructure comprising 18 spherical tanks with a total capacity of 27,000 m³, 14 vertical tanks with a capacity of 50,000 m³, 2 horizontal pressure vessels with a capacity of 5,000 […]

ITS on the S6 and S7 Expressways

Aldesa is implementing a modern Traffic Management System on the S6 and S7 expressways. The aim of the project, which covers 31 km of the S6 and 200 km of the S7, is to improve safety and enhance traffic flow by monitoring road conditions and quickly providing drivers with up-to-date information. As part of the […]

Construction of the S17 Expressway: Piaski – Łopiennik

Aldesa will design and construct a 16.6 km section of the S17 expressway between Piaski and Łopiennik. The contract value is approximately PLN 810 million. The route will follow a new alignment alongside the existing National Road No. 17, starting at the Piaski Wschód interchange, which will be reconstructed to connect the S17 expressway with […]

Construction of the S74 Expressway: Łagów – Opatów

The contract covers the construction of an 18.3 km section of the S74 expressway from Łagów to Opatów in the Świętokrzyskie Voivodeship. The contract value amounts to PLN 632 million. In accordance with the contract, the project implementation period is 39 months, excluding winter periods. The Łagów – Opatów section will connect with the planned […]

Modernisation of the Gdańsk Stogi Tram Line

The project involved the reconstruction of approximately 4 km of double-track tram line, divided into three sections: Budzysza Street, from the junction with Sucharskiego Street to the junction with Skiby Street. Stryjewskiego Street, from the junction with Skiby Street to the junction of Nowotna Street and Krucza Street, including the “Pasanil” tram loop. Nowotna Street, […]