Renewable Energy

GEOMEX SAN JACINTO WIND FARM

CLIENT

Generadores Eólicos de México, S.A DE C.V.

Localization

MEXICO

Activity

Wind farms

Construction of the San Jacinto Wind Farm, with an installed capacity of 20 MW. The contract included all engineering, procurement and construction activities, as well as testing and commissioning of the facility. The scope comprised the installation of wind turbines, foundations, electrical interconnection systems, associated civil works, and the delivery of operation manuals and as-built documentation. The project was completed with both provisional and final acceptance by the client, in compliance with the required technical and quality standards, while ensuring continuous operation through the supply and installation of upgraded critical components.



Execution time

-

Budget

€546,526,890.56

Status

Completed