Comprehensive delivery of the EP44 wind farm project in Lębork, in the Pomerania region, for the French client Akuo Energy, including the preparation of detailed technical documentation and execution under a BOP contract.
The wind farm has a total installed capacity of 44 MW and comprises 12 Vestas V110 wind turbines with a capacity of 2 MW each and a hub height of 95 m, as well as 10 Vestas V110 wind turbines with a capacity of 2 MW each and a hub height of 125 m.
The project included the construction of access roads, platforms, and temporary turbine assembly areas covering 141,979 m²; foundations for 22 wind turbines; underground networks, including a 30 kV medium-voltage line and fibre-optic cabling with a total length of 34,907 m; a 2.55 km overhead and underground 110 kV high-voltage line; and a 30/110 kV GPO substation equipped with two 25 MVA transformers.