Construction of the S7 expressway between Płońsk and Czosnów, on the section from the Siedlin interchange (excluding the interchange) to the Załuski interchange (excluding the interchange). The route is 12.9 km long.

The EU-funded project is being implemented to create a safe road section that will improve Poland’s transport accessibility and interregional connections within the TEN-T network, while enhancing mobility through the construction of a safe expressway section forming part of the trans-European TEN-T transport corridor.

El contrato establece un plazo total de 45 meses, de los cuales 18 meses corresponden a la fase de diseño y tramitación de la autorización ZRID (permiso de implementación de inversión en carreteras).

Execution time

4 years and 3 months

Budget

zł563,001,357.26

Status

In Progress