Infrastructure

Construction of the S6 Expressway: Bobrowniki – Skórowo

CLIENT

GDDKiA / oddział Gdańsk

Localization

POLAND

Activity

Roads

The contract covers the construction of a dual-carriageway expressway on the 13-kilometre section between the Bobrowniki and Skórowo interchanges, as well as the construction of two road interchanges – Rzechcino and Skórowo – together with the associated infrastructure. The contract value amounts to PLN 283.1 million. This is one of three sections of the Słupsk – Lębork route.

The section of the S6 expressway from Bobrowniki to Skórowo, being constructed by Aldesa, uses cement concrete pavement. With the exception of three engineering structures, the concrete pavement will be laid along the entire section.

Execution time

Duration not specified

Budget

-

Status