Implementation of a road corridor with a total length of 183.75 km, extending from the city of Sarandí del Yí to Lascano, including 145.14 km along Route No. 14 and 38.61 km along Route No. 15. The scope includes the construction of a new alignment for Route No. 14, incorporating realignments, bypasses, and new junctions along Sections N1 (Route 6 – Route 7), N2 (Route 7 – Route 108), and N3 (Route 108 – Route 8). New pavement is being constructed along Sections 304, 305, 310, and 311, including the Lascano bypass – Section 305 – which involves the construction of an embankment and a bridge across the floodplain of the Cebollatí River.