The project consists of connecting the Choczewo substation to the existing Słupsk–Żarnowiec transmission line, with the aim of strengthening Poland’s power grid and facilitating the integration of electricity generated by offshore wind farms in the Baltic Sea. Aldesa is constructing this 400 kV transmission line for Poland’s transmission system operator, Polskie Sieci Elektroenergetyczne (PSE).