Renewable Energy

CONNECTION OF THE CHOCZEWO SUBSTATION TO THE SŁUPSK–ŻARNOWIEC TRANSMISSION LINE

CLIENT

Cliente no disponible

Localization

POLAND

Activity

Electrical installations

The project consists of connecting the Choczewo substation to the existing Słupsk–Żarnowiec transmission line, with the aim of strengthening Poland’s power grid and facilitating the integration of electricity generated by offshore wind farms in the Baltic Sea. Aldesa is constructing this 400 kV transmission line for Poland’s transmission system operator, Polskie Sieci Elektroenergetyczne (PSE).

Execution time

Duración no especificada

Budget

-

Status