Aldesa is carrying out the design and construction of a section of the S10 expressway in Poland. The works will include the creation of two new junctions, the refurbishment of the Wyrzysk interchange and the construction of 15 engineering structures, including wildlife crossings. In addition, service areas will be built with charging points for electric vehicles, a smart traffic management system and a new maintenance centre powered by renewable energy. The project covers a stretch of more than 20 kilometres between the towns of Pila and Bydgoszcz and will have a construction period of 47 months.<br/>