Infrastructure

S7 EXPRESSWAY PŁOŃSK – CZOSNÓW

CLIENT

Generalny Dyrektor Dróg Krajowych i Autostrad

Localization

POLAND

Activity

Roads

Construction of the S7 expressway between Płońsk and Czosnów, on the section from the Siedlin interchange (excluding the interchange) to the Załuski interchange (excluding the interchange). The route is 12.9 km long.
The EU-funded project is being implemented to create a safe road section that will improve Poland’s transport accessibility and interregional connections within the TEN-T network, while enhancing mobility through the construction of a safe expressway section forming part of the trans-European TEN-T transport corridor.

The project also includes the construction of a Motorway Service Area (MOP), a Road Maintenance Centre (OD), and two new road interchanges: Poczernin and Przyborowice.

The contract provides for a total implementation period of 45 months, including 18 months for the design phase and obtaining the ZRID road investment permit.

Execution time

Duration not specified

Budget

€563,001,357.26

Status