Design, engineering, procurement, construction, testing, and commissioning of the “Guajiro” solar photovoltaic plant, with an installed capacity of 101.40 MW. The scope includes the complete execution of all works required for the project, from site preparation through the installation of electrical and interconnection infrastructure, as well as the construction of operation and maintenance buildings, control and monitoring systems (SCADA), and the transmission line for grid connection. The contract also includes maintenance of the plant for the specified period, ensuring optimal performance and availability.





