Execution of works for the supply and installation of equipment at the Guerrero Negro desalination plant in Baja California Sur. The works included the installation of mechanical, hydraulic, and electrical systems, as well as the adaptation of existing infrastructure to optimise the production and distribution of drinking water. The scope also included commissioning and operational testing, ensuring compliance with the applicable technical and regulatory standards.

