Construction of the Abangares solar photovoltaic plant, with an installed capacity of 86.3 MWp. The EPC contract, being carried out in consortium with Ozul, includes all engineering, procurement and construction activities, as well as the testing and commissioning of the solar plant. The scope includes the supply and installation of 119,028 bifacial photovoltaic modules, the associated civil works, and the electrical interconnection systems required to deliver the generated energy to the ICE and Coopeguanacaste grids. The project is scheduled to commence commercial operations in August 2028.