Renewable Energy

BELVIS I, II AND III PHOTOVOLTAIC PLANTS

CLIENT

ALDENER EXTREMADURA, S.A.U

Localization

SPAIN

Activity

Photovoltaic Plants

Construction of a 30/220 kV step-up substation, with voltage levels of 30 kV at medium voltage and 220 kV at high voltage, designed to collect the electricity generated by the Belvis I, Belvis II and Belvis III photovoltaic plants, with a combined total installed capacity of 104.5 MWp. The project includes the installation of solar panels and the necessary power evacuation infrastructure, comprising an approximately 2.48 km overhead interconnection line and a 0.43 km underground line, connecting to the national electricity grid through the SET Almaraz ET 220 substation.

Execution time

479 days

Budget

€69,993,538.38

Status

In Progress