The project involves the implementation of the second stage of the tram line in Petržalka, connecting Bosákova with Janíkov dvor in Bratislava, Slovakia. The contract includes the construction of 3.9 km of new tram line, seven modern stops, two bridges, a cycle path, and pavements. The works also include urban integration measures and accessibility improvements, in accordance with the technical and quality standards required by the local authorities.


