TÚNEL EMISOR PONIENTE II
Construction of the first stage of the Túnel Emisor Poniente II and improvement of the open-channel section of the existing Emisor Poniente.
The works included the initial construction of the Túnel Emisor Poniente II, comprising excavation, lining, and ventilation systems, as well as the rectification and adaptation of the existing open-channel section.
The project includes engineering works, civil works, installations, and finishes required to ensure the hydraulic capacity and operational performance of the infrastructure, improving the control and conveyance of wastewater and stormwater in the western area of the Valley of Mexico.



